OEE, downtime, and scrap across the plant
OEE broken into availability, performance, and quality, with downtime by reason, scrap by defect, and cost variance against standard, by plant, press, and shift.
The challenge
Each plant and shift counts output and downtime its own way, so OEE cannot be compared and the biggest losses stay in machine logs nobody consolidates.
What we build
The build models production, downtime events, scrap, and standard cost into a governed model, defines availability, performance, quality, and OEE once, and ranks losses by reason, press, and shift.
In the build
- A governed model over production, downtime, and scrap.
- OEE split into availability, performance, and quality.
- A downtime Pareto by reason, plus scrap and cost variance.
Outcomes
- OEE compared fairly across lines and shifts.
- The biggest downtime causes ranked, not buried in logs.
- Scrap and cost variance read next to the output they cost.
Data sources
Microsoft stack
The dashboards
The report we build, re-skinned here in the browser. Switch pages with the tabs and hover the charts. Representative, not a specific client.
OEE & Losses
— YTD October 2026- Mold change / setup19,008
- Hydraulic failure4,362
- Ejector / mold damage2,224
- Dryer / resin moisture1,728
- No operator / setup tech1,685
- Heater band / thermocouple1,639
- Quality hold1,533
- Stuck part / cooling line1,226
- Resin shortage985
| Press | Plant | OEE | Avail. | Perf. | Quality | Δ pts | Unpl. h |
|---|---|---|---|---|---|---|---|
| ELP-04 | El Paso | 55.1% | 67.3% | 83.8% | 97.8% | -12.6 | 941 |
| ELP-11 | El Paso | 61.6% | 71.4% | 87.9% | 98.2% | -10.1 | 556 |
| ELP-09 | El Paso | 61.6% | 71.3% | 87.9% | 98.2% | -11.6 | 571 |
| ELP-08 | El Paso | 61.6% | 71.5% | 88.0% | 98.0% | -10.3 | 550 |
| ELP-12 | El Paso | 61.7% | 71.4% | 87.9% | 98.2% | -11.5 | 573 |
| ELP-10 | El Paso | 61.8% | 71.7% | 87.8% | 98.2% | -11.0 | 547 |
| ELP-02 | El Paso | 62.3% | 71.8% | 88.0% | 98.6% | -10.6 | 558 |
| ELP-05 | El Paso | 62.4% | 71.8% | 88.1% | 98.6% | -9.9 | 558 |
The plant reads OEE, downtime, scrap, and cost variance the same way across lines and shifts, and sees which losses cost the most.
A representative build that shows what we deliver, not based on a specific client. Named-client work is shared only with written permission.
Build this on your own data.
A Power BI assessment delivers working dashboards on your real data in about two weeks, with a fixed quote for the build.